This analysis investigates makespan minimization under constraints for two agents, revealing NP-hard challenges.
In this paper, we consider the two-agent scheduling with time-dependent and position-dependent processing time in a two-machine flow-shop system. The objective is to minimize the makespan of agent A under the constraint that the objective of agent B cannot exceed a given upper bound. In the time-dependent processing time model, the constraint is the makespan of agent B. We first show that the problem is NP-hard in the {{red}ordinary sense}. Then we prove that there exists an optimal schedule which is a permutation schedule, and there exists an optimal schedule in which the adapted version of Johnson's rule do not hold for {{red}neither agent A nor agent B}. Furthermore, we show that three special cases are polynomially solvable. In the position-dependent processing time model, if the constraint is the makespan of agent B, we show that the problem is NP-hard in the ordinary sense. If the constraint is the total completion times of agent B and jobs have different release dates, the problem is strongly NP-hard.
No takes yet. Share an insight, caveat, or question.
Miao et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: