Answers are grounded in this paper and cite their sources.
Analysis indicates a water surplus using the F.J. Mock method, but deficits remain with direct testing.
Drought frequently occurs in Trenggalek Regency, with Prambon Village being one of the affected areas. The prolonged droughts in Prambon Village cause the water sources to dry up. As the population increases, so does the water demand. This study used arithmetic methods to project the population size until 2032. To assess the availability of water, the study used the F.J. Mock method and direct testing. According to the F.J. Mock method, the water balance indicated a surplus, projecting that the available water supply would meet the villagers' needs through 2032. However, the water balance based on data from the PKPLH Department and direct testing shows a deficit, insufficient to meet the population's needs until 2032. To address this issue, the conservation of water resources is necessary, involving the construction of spring protections, tree planting, and rainwater harvesting to ensure that the water needs of Prambon Village residents are met. This research serves as a reference for clean water utilization in Trenggalek Regency.
No takes yet. Share an insight, caveat, or question.
Amalia et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: