Synapse
⌘+K
Synapse
PulseExploreClubsResearchersJournals
Instagram
HomeClubsExplore
September 17, 2024

Influx Detected and Circulated Out Entirely with MPD on the First Deployment of MPD on Deepwater Rig. A Description of the Well Planning and Execution Process

View Full Paper
Ask AI
Bookmark
Share

Authors

TSThomas C. SmithIPIsabel PoletzkyRNR. van Noort

Discussion

Loading...

Member takes

Overview

Key Points

Key points are not available for this paper at this time.

Cite This Study

Smith et al. (2024) studied this question.

synapsesocial.com/papers/68e5833db6db643587520bf0https://doi.org/10.2118/221448-ms
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1MPD Deepwater Drilling: A Case Study of MPD Surface Back Pressure Implementation for a Sidetrack Exploration Well in the Gulf of Mexico2024 · 1 citations
  2. 2Optimizing Well Design with MPD and IME: A Case Study from Offshore Mexico2025
  3. 3Implementing MPD Technology as a Trial to Reduce Rig Days and Mitigate Major Drilling Hazards in New Unconventional Drilling Campaign Field Hence Improving Overall Drilling Process Efficiency, Case Study of 53 Wells2024
  4. 4MPD Well Control During Non-Drilling Operations2024 · 1 citations
  5. 5Management of Cross-Flow Events in High pressure, Deep Disposal Wells Using MPD Techniques2024