Answers are grounded in this paper and cite their sources.
This article presents the basics and results of applying the Lean R&D methodology in planning as a crucial tool for enhancing the success of innovative projects. By following a step-by-step process, the effectiveness of project execution is improved through a comprehensive list of key tests that increase in complexity. This approach simplifies early identification of potential issues and reduces the risk of errors during the design phase. A new lean planning method is introduced, including assessing the readiness of the designed product at the design stage based on a roadmap. It also involves analyzing the critical elements (CE) of the product and determining their current level of readiness. Additionally, a functional analysis of the CE is conducted, followed by separate planning for the development of each element. Finally, the project is checked against a set of criteria to achieve technology readiness levels (TRL+). The process of lean planning is demonstrated in the field of engine building through the case of integrated starter-generator (SG) development. Specific elements of the planning structure are considered, and a functional analysis of the SG’s CE is conducted for both internal and external primary and secondary impacts. Their interactions and control events are determined according to detailed TRL+ criteria, allowing for the reduction of technological risks, shorter project execution times, and increased efficiency in innovative technology development through the use of this planning tool
No takes yet. Share an insight, caveat, or question.
Kondryakov et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: