The Barito River is the largest river in Indonesia with a discharge of 4,160 m 3 /second. The project objective is to deepen the port area of the Port Expansion to meet the minimum barge draft with a ship width of 28 m, ship draft 6.5 m and ship length 100 m. The estimated volume of dredging for an area 40 ha with an existing riverbed −13 mLWS is 2,500,000 BCM. Geotechnical dredging studies include slope stability analysis, bearing capacity of soil reinforcement and sampling of embankment material types. Bathymetry measurement method using multibeam Echosounder and Sub-Bottom Profiler. Dredging modeling uses DHI Mike Hydrodynamics and Mud Transport Module software. The ship uses a Cutter Suction Dredger type with capacity of 5,000 m 3 /day and Pelican Barge with capacity of 6,000 m 3 /day. The model input used is TSS and the percentage of 5 river sediment grain size classes in the Upstream, Middlestream and Downstream project locations. Scenario model dredging was carried out with 12 different scenarios in the installation of 2 silt curtains. With pollutant transport and geotechnical models, landslides and sediment distribution patterns can be mitigated.
No takes yet. Share an insight, caveat, or question.
Riyadi et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: