Answers are grounded in this paper and cite their sources.
This paper discusses how the designer and owner addressed operational and maintenance challenges of a sewer system built over 32 years ago. The existing 16,000 linear feet (LF) of 27-in. reinforced concrete pipe (RCP) interceptor sewer has experienced collapses due to hydrogen sulfide corrosion. Preliminary engineering included condition assessment, hydraulic analysis, and cost–benefit alternative analysis. Replacement of the interceptor includes a segment of the pipeline that crosses a tributary to the Red Oak Creek. The existing crossing at this location is an encased aerial system with supporting piers on both ends. Design of a new tributary aerial crossing revealed that an encased 48-in. carrier pipe would backup stormwater flow in the tributary channel because of a new lower flow line, which would require a new, long easement for grading upstream. An alternative to the aerial crossing would be a siphon design that traditionally would use concrete structures on either end. Due to the owner's operational and maintenance challenges associated with concrete siphon structures, an alternate solution to a traditional siphon design was developed in the form of a siphon with FRP wye manifolds.
No takes yet. Share an insight, caveat, or question.
Pandey et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: