Speeding up the construction of smart grid characterized by information, automation and interaction puts forward higher requirements for the construction of transmission line projects. Based on the 3D design model and data mining technology of transmission and transformation engineering, this paper collects, manages and analyzes the geographic information data of transmission lines such as high-precision Lidar and orthographic image, and realizes the design of transmission lines. Based on grid information model (GIM) and geographic information system (GIS), the approach scheme of transmission line mechanized construction under 3D simulation scenario is designed. At the same time, in order to select the optimal construction scheme and reduce the construction cost, the improved whale optimization algorithms-convolutional neural network (IWOA-CNN) model is adopted to improve the accuracy of engineering quantity prediction.
No takes yet. Share an insight, caveat, or question.
Jiang et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: