Answers are grounded in this paper and cite their sources.
Freight transportation by rail is considered to be more time-efficient than road transportation. In response, the government has activated the freight rail line between Tawang Station and Tanjung Emas Port.Objectives: This study focuses on solving drainage system problems by designing a drainage channel.Methodology: This study uses hydrological and hydraulic calculations that are needed to get drainage design.Conclusion, Significance and Implication: The open space condition along the section of Stasiun Tawang – Pelabuhan Tanjung Emas from Km.0+275 to Km. 0+660 meets the standards ranging from 2.44 to 10.87 meters, while the standard used is 2.35 to 2.53 meters. Therefore, a drainage canal can be constructed. The results of the hydrological analysis show the planned flood discharge for 5-10 years. For 5 years, it is 0.906075 m³/sec, and for 10 years, it is 1.029242 m³/sec. The design for the new spillway includes trapezoidal and rectangular shapes. The trapezoidal design uses a cross-sectional width of 0.60 meters and a channel height of 0.70 meters, while the rectangular design uses a cross-sectional width of 0.80 meters and a channel height of 1.00 meters.
No takes yet. Share an insight, caveat, or question.
Sejati et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: