This article aimed to evaluate construction waste management indicators in the city of Belém do Pará and, thus, compare them with the coefficients obtained in the literature. The research methodology was carried out through the application of a questionnaire in inspected works in the capital of Pará, where information regarding the management and volume of waste produced was obtained. The results obtained were lower than those identified in the literature, concluding that, possibly, the city of Belém did not advance in the mandatory legislation that refers to the adequate management of construction waste.
No takes yet. Share an insight, caveat, or question.
Reis et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: