Construction scholars and professionals have recognized the integration of Building Information Modelling (BIM), Integrated Project Delivery (IPD), and Lean Construction (LC) as an effective way to increase collaboration and deliver construction projects. However, construction organizations cannot identify the transitional management steps required to achieve BIM-IPD-LC (BIL) implementation maturity. This paper presents a roadmap, introducing a BIL Maturity Model (MM) through iterative rounds of semi-structured interviews, model validation through a survey, and model implementation.