Answers are grounded in this paper and cite their sources.
Drilling and Well Intervention job safety aspects need to be prioritized as one of the main Key Performance Indicators to maintain production continuity and achieve yearly targets. The main hazard in these works is blowout. To anticipate blowout, a Primary Barrier and Secondary Barrier are needed. However, in abnormal conditions, the barriers cannot work properly; thus, a kick occurs. When a kick occurs, there is a golden period of countermeasures so that the potential for a blowout does not escalate further. One of the most important stages is the duration of installing Full Opening Safety Valve. Humans can only do this stage; thus, personnel alertness will be the most important barrier in protecting the well when the well condition is underbalanced. The installation of a Full Opening Safety Valve is intricately linked to the physical competence of Rig personnel. To enhance this competence, a training facility is indispensable. This facility, known as the Dummy Well, is an artificial well comprising a pumping system and a piping system equipped with a nozzle. It serves to simulate real kick bursts, thereby honing the skills of the personnel and boosting their confidence in dealing with such situations. The efficacy of the kick simulation training in the dummy well is evident in the significant reduction in the duration of Full Opening Safety Valve installation by Rig personnel. This training, conducted repeatedly, has yielded impressive results. On average, after seven training sessions, the duration of FOSV installation was reduced to 40 seconds, a staggering 91% decrease compared to the initial condition. Moreover, this training has not only improved the efficiency of the personnel but also bolstered their confidence in handling emergency conditions, a qualitative measure of success. Dummy Well is the first kick drill training facility in Indonesia. It can increase the reliability of the blowout prevention barrier through human power so that it can anticipate the occurrence of larger catastrophic disasters and maintain production continuity. No matter Whether Rig operations are on a large or small scale, blowout is a major risk that is common in upstream oil and gas business processes.
No takes yet. Share an insight, caveat, or question.
Ajiguno et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: