Synapse
⌘+K
Synapse
PulseExploreClubsResearchersJournals
Instagram
HomeClubsExplore
August 6, 2024

Managed Pressure Wells – Managing the Improbable Formation Exposure – A Case Study in Bach Ho Field, Vietnam

View Full Paper
Ask AI
Bookmark
Share

Authors

NCNguyễn Văn CươngUniversity Of Transport TechnologyTATa Quoc AnhBQBao Ta QuocWeatherford (Norway)

Discussion

Loading...

Member takes

Overview

Key Points

Key points are not available for this paper at this time.

Cite This Study

Cường et al. (2024) studied this question.

synapsesocial.com/papers/68e5d57ab6db64358756b65ehttps://doi.org/10.2118/219572-ms
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Enabled Resuming Drilling, Run Liner and Cementation by First Distinguishing from Kick and then Overcoming Extreme Ballooning Conditions in a Controlled Environment, Navigating Through Ultra-Narrow Window in Abnormal Pressure Wells by Implementing Managed Pressure Techniques2025
  2. 2Enhancing Dynamic Formation Integrity Test and Dynamic Leak Off Test Value Through Effective Wellbore Strengthening and Managed Pressure Drilling2024
  3. 3Successful Utilization of Managed Pressure Cementing During Running and Cementing 7 Inch Liner Through Rotating Control Device in a Narrow Mud Weight Window for an Unconventional Well2024
  4. 4Not Just for Drilling! Implementing MPD to Prevent and Control Mud-Losses During Post Drilling Operations Like Reaming, Logging, Cementing Long-String Tubing, a Case Study of 2 Wells2024 · 1 citations
  5. 5Enhancing Well Integrity with Managed Pressure Drilling and Cementing in Challenging Zones with Significant Fluid Losses2025 · 1 citations