July 30, 2024Stavební obzorOpen Access

Construction Technology and Application of TBM in Shengli Tunnel of Tianshan Mountain under poor geological conditions

View Full Paper
Ask AI
Bookmark
Share

Authors

ZZZhenping ZhaoCJChen Jian-xunQGQi Geng

Discussion

Loading...

Member takes

Overview

Key Points

Key points are not available for this paper at this time.

Cite This Study

Zhao et al. (2024) studied this question.

synapsesocial.com/papers/68e5e8feb6db64358757e41chttps://doi.org/10.14311/cej.2024.02.0012
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1TBM Tunnelling Under Adverse Geological Conditions: Case Study of a Long-Distance and Deep-Buried Water Conveyance Tunnel2024 · 1 citations
  2. 2Investigation on Disaster Mechanism of Diversion Tunnel Induced by Gripper TBM in Hydrokarst Erosion Stratum and Engineering Measures2024 · 3 citations
  3. 3Geological and hydrogeological risk assessment for tunnel excavation in water-bearing tuff zones: a case study2025
  4. 4Risk assessment of mountain tunnel collapse under complex geological conditions2026
  5. 5Construction Mechanical Characteristics of TBM Pilot and Enlargement Method for Ventilation Tunnel of Wuhai Pumped Storage Power Station2024 · 7 citations