Engineer-to-order (ETO) production is a method in which products are designed and manufactured in response to customer orders. Typical products of ETO production targeted in this study are large products such as power plants, plants, and shipbuilding. These products have long lead times and delivery times, and production plans need to be generated for a year or more in advance. This study proposes a hierarchical production planning (HPP) framework to generate long-term, medium-term, and short-term production plans using common granularity of production equipment and unit time on production planning method for ETO production of large products. A load planning required for the long-term production plan is formulated as an integer programming problem, and the load plans are generated using a mathematical programming solver and a constraint programming solver.
No takes yet. Share an insight, caveat, or question.
IWAMURA et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: