Answers are grounded in this paper and cite their sources.
Railway lines require a significant amount of natural raw materials. Industrial by-products can be used instead, reducing the costs of natural aggregate exploration. This work analyzes a ballasted track’s short- and long-term performances when replacing conventional sub-ballast aggregate with steel slag. After an extensive laboratory characterization of the steel slag, the material performance was analyzed in a 3D numerical model of a ballasted track when included in a railway track. An empirical model was implemented and calibrated to predict the long-term permanent deformation induced in the track after many train passages. The results are compared with the allowable deformation limits required for conventional high-speed ballasted track railway lines. An additional analysis was conducted to assess the influence of steel slags on the critical speed of conventional railway tracks when used. The results show a residual impact on the critical speed value compared to the conventional sub-ballast made with natural aggregates.
No takes yet. Share an insight, caveat, or question.
Alves et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: