Answers are grounded in this paper and cite their sources.
This article provides the procedure for determining direct, overhead, maintenance costs and the procedure for drawing up object, local and consolidated estimates. A study of the peculiarities of formation of the cost of construction work was carried out. Construction work is one of the main indicators of the activity of a construction organization.
No takes yet. Share an insight, caveat, or question.
Akhmedovich et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: