This is the authors' abstract. We don't add key points for this paper.
This project involved undertaking a stability analysis of an unreinforced concrete gravity dam. The stability assessment considered the 1 in 10 000 year and probable maximum flood events as well as the effects of ice and seismic loading, concluding that the above-ground dam section did not meet modern factors of safety and that further works would be required to stabilise the dam.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Prithula Roy Choudhury (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: