Answers are grounded in this paper and cite their sources.
The Doan Valley Tunnel Storage (DVT) Project is part of the Northeast Ohio Regional Sewer District's (NEORSD) Combined Sewer Overflow Long Term Control Plan (CSO-LTCP). The project involves the construction of a storage tunnel and conveyance tunnel system that will reduce the number of overflows from CSO outfalls that flow to Lake Erie. The Project includes the construction of three tunnel systems: Doan Valley Storage Tunnel (DVT), Martin Luther King Conveyance Tunnel (MLKCT), and the Woodhill Conveyance Tunnel (WCT). These systems include the construction of approximately 19,300 linear feet (LF) of tunnel in rock, seven shafts, two adits, and near surface diversion structures, consolidation sewers, an emergency overflow, overflow structures, gate control vaults, and vents. Flows within the Project system are driven by gravity. This presentation summarizes the design approaches and construction challenges that were encountered to mitigate risks during design and construction stages.
No takes yet. Share an insight, caveat, or question.
Park et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: