Answers are grounded in this paper and cite their sources.
Abstract Working procedures is the key link of equipment maintenance in hydropower stations. Excellent working procedures is beneffcial to improve maintenance quality and efffciency. However, for the complex hydropower station equipment with multiple parts, it is difffcult to obtain the multi-person collaborative working procedures of maintenance tasks. To overcome this problem, this paper establishes a multi-person asynchronous parallel disassembly sequence planning (DSP) model and solves it using a discrete random forest algorithm (DRFA). Firstly, based on the actual operation environment of the hydropower station, a disassembly model is constructed by considering the disassembly tools, disassembly direction, part distance, and working space. Secondly, DRFA is proposed. Meanwhile, a sub-tree fftting strategy and a sub-tree iteration mechanism are introduced to increase the probability of ffnding the optimal sequence. Thirdly, taking hydropower station equipment as example, higher quality disassembly sequencecan be obtained by DRFA compared with simpliffed discrete gravitational searchalgorithm (SDGSA), genetic algorithm (GA), and simpliffed swarm optimization(SSO), which reffects the applicability of the method.
No takes yet. Share an insight, caveat, or question.
Li et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: