Answers are grounded in this paper and cite their sources.
Testing of large wind turbine components plays a central role in delivering reliable yet cost-effective technology. However, these experiments are often lengthy and costly. Fatigue testing of a wind turbine blade might take up to 12-14 months, whereas highly accelerated lifetime testing of a nacelle demands 6-8 months. The exchange of simulation models and data between OEMs and test facilities is recognized as a critical factor in the planning of an experimental campaign. In fact, OEMs are typically very protective of their industrial secrets, and sharing such sensitive information may constitute a threat. It follows that the use of simulation models to enable more effective experimentation is not pursued efficiently. Digital twins are emerging as a key enabling technology to improve the operation & maintenance of test benches for the wind industry. A digital twin combines physical systems and their digital models into a cyber-physical system to provide functionalities that cannot be attained by either physical or digital assets independently. The seamless integration of the test bench with digital models offered by a digital twin is expected to enhance the interaction between OEM and test bench operators. This proceeding illustrates the status of the development of the DIGIT-BENCH digital twin developed by R&D Test Systems (R&D) and Aarhus University to serve large-scale test facilities for the wind industry. The digital twin utilizes FMI-based co-simulation to enable the coupling of physical/digital components in an industrial-secret-friendly environment. The digital twin concept is demonstrated on a 2-degrees-of-freedom test bench installed at Aarhus University.
No takes yet. Share an insight, caveat, or question.
Baş et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: