This is the authors' abstract. We don't add key points for this paper.
The flexible distribution network presents a promising architecture to accommodate highly integrated distributed generators and increasing loads in an efficient and cost-effective way. The distribution network is characterised by flexible interconnections and expansions based on soft open points, which enables it to dispatch power flow over the entire system with enhanced controllability and compatibility. Herein, we propose a multi-resource dynamic coordinated planning method of flexible distribution network that allows allocation strategies to be determined over a long-term planning period. Additionally, we establish a probabilistic framework to address source-load uncertainties, which mitigates the security risks of voltage violations and line overloads. A practical distribution network is adopted for flexible upgrading based on soft open points, and its cost benefits are evaluated and compared with that of traditional planning approaches. By adjusting the acceptable violation probability in chance constraints, a trade-off between investment efficiency and operational security can be realised.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: