Numerical simulation demonstrates improved passenger satisfaction and lower operating costs in high-speed rail corridors, highlighting benefits of flexible capacity allocation.
When facing a surge in passenger demand especially during holidays, dispatchers have to adjust train operation organization for busy high-speed railway corridors. This paper is devoted to optimizing transport capacity considering the capacity pool and flexible train composition with time-dependent passenger demand to generate new timetables for both regular and additional trains. A bi-objective mixed integer programming model is formulated to minimize the waiting time of passengers and operation costs for capacity utilization. A local search technique is hybridized into an elitist heuristic algorithm based on NSGA-II to generate high-quality solutions. Two sets of numerical experiments are carried out based on a small-scale example and real-world data from the Wuhan-Guangzhou high-speed railway corridor to verify the effectiveness of the proposed methodology. The results show that (1) when considering time-dependent passenger demand, the satisfaction rate exceeds 90%; (2) when optimizing transport capacity, satisfaction is guaranteed while bringing reduction in operation costs.
No takes yet. Share an insight, caveat, or question.
Feng et al. (2024) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: