Answers are grounded in this paper and cite their sources.
Heavy mechanized bridge is utilized to be rapidly deployed as a temporary bridge to facilitate the movement of vehicles and personnel across obstacles. This paper presents a dynamic model of the TMM-3M heavy mechanized bridge during the span-lowering process, including considerations of cable deformation, rear outriggers, elasticity of tire, and front suspension system. Based on the dynamic model, the authors establish a system of differential equations describing the oscillation of the system using Lagrangian equations of the second kind. The article provides a fundamental basis for studying the entire process of deploying the TMM-3M bridge and aims to improve the rear outriggers and cable winding system to reduce bridge deployment time.
No takes yet. Share an insight, caveat, or question.
Tran et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: