Answers are grounded in this paper and cite their sources.
Zonal isolation during the primary cementing operation is a must; failure to achieve it can lead to problems including loss of production, safety concerns, regulatory non-compliance, increased cost of drilling the well, remedial cementing operations, loss of well integrity, and decreased life of the well. This is a case study of two successful primary cementing operations with an operating window (pore-fracture pressure) of less than 10 lbm/ft3 in carbonate reservoirs sections. In this study, a managed pressure cementing (MPC) technique was employed to address challenges posed by a narrow annular gap and the necessity for increased equivalent circulating density (ECD) while cementing. Our approach incorporated an engineered heavy-weight slurry, a specially designed wellbore shielding spacer, and an environmentally friendly loss circulation material (LCM) capable of sealing formations up to 3,500 mD. The cementing design aimed to control the operating window between the reservoir pore pressure and fracture pressure, without inducing detrimental losses to the formation. Because the ECD during the primary cementing operation was above the fracture pressure, the pressure concerns had to be addressed to ensure safety, proper cement placement, and achieve a quality cement bond for zonal isolation. A unique cementing approach was implemented whereby the operator combined industry best practices with the shielding component and the LCM and MPC operation. This allowed the operational parameters, such as pumping rate and pressure, to be adjusted during the execution of the cementing job to ensure that the ECD surges were mitigated for a near constant bottomhole pressure (BHP) during the placement of cement in the annulus. The operation was successful with cement reaching the top of desired depth and successfully isolating the zone. This paper covers the details of the design, execution, and evaluation of two cementing operations which combined the novel shielding component with LCM and MPC operations. This novel combination of materials and technique allowed the top of cement to reach the desired depth and ensure well integrity in both cases. It can be applied in wells where the ECD during cement placement is only slightly above the fracture gradient.
No takes yet. Share an insight, caveat, or question.
Masoud et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: