Answers are grounded in this paper and cite their sources.
The aim of this project is to replace cement with plastic waste in paver block and to reduce the cost of paver block when compared to that of convention concrete paver blocks. At present nearly 63 millions tones of plastic waste is produced in India per year. The degradation rate of plastic waste is also a very slow process. Hence the project is helpful in reducing plastic waste in a useful way. In this project we have used plastic waste in different proportions with quarry dust, coarseaggregate and ceramic waste. The paver blocks were prepared and tested and the results were discussed.
No takes yet. Share an insight, caveat, or question.
Prof. Sudarshan Patil (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: