An 18,580 sq. m (200,000 sq. ft) trucking terminal facility was built in the southwest suburbs of Chicago, Illinois. The site is located on a marsh near Stoney Creek. Local authorities filled in the site with debris from a tornado that tore a 26-km (16-mi) path through the area in 1967. Subsequently, the site was paved over for use by a trucking company. The resulting soil profile consists of 3−6 m (10−20 ft) of fill and refuse overlying organic clays up to 10.7 m (35 ft) below existing grade. The new trucking terminal is supported by approximately 2,600, 350-mm (14-in.) diameter rigid inclusions (RI), installed through the fill and organic materials into a very stiff silty clay or a dense sand and gravel layer. The geotechnical contractor outfitted its drill rig with a data acquisition system that provided valuable information to the project team. The system measured total depth, drilling/withdrawal rates, torque/crowd pressure, grout pressure, and incremental and total grout volume, among other execution parameters. Project quality reviewers observed a drop in grout pressure in approximately 10% of the installed elements during grouting operations through the fill/refuse layer. Under typical quality control practices, these elements would have been accepted since the total grout volume and pumping rates were within the required specifications. The geotechnical contractor found that, during performance testing, there was a significant degradation in the performance of elements with grout pressure drops when compared to those without grouting anomalies. By validating the installation procedure and monitoring equipment, the geotechnical contractor was able to show the most likely cause of the grouting pressure drops was a result of irregularities in the fill/refuse layer. The data acquisition system allowed the geotechnical contractor to identify, verify, and remediate deficient elements prior to excavation and installation of the building footings, while minimizing the impact to the project schedule and budget.
No takes yet. Share an insight, caveat, or question.
Dellaria et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: