SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting linear accelerator composed of 37 cryomodules and two large helium refrigeration systems with a cooling capacity of 4 kW at 2.0 K. The LCLS-II Helium Refrigeration System (HRS) consists of two compressor stations, each with a power of approximately 4.5 MW, two 4.5 K cold boxes, each with a power of 18 kW equivalent at 4.5 K, and two sets of cold compressors that can each produce a flow of 230 g/s at 31 mbar (2.0K). Performance tests of the HRS were meticulously planned and successfully carried out, with results demonstrating that it exceeded the process requirements for LCLS-II operations. This paper provides a detailed presentation of the LCLS-II HRS performance and the challenges encountered during the commissioning phase.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Apte et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: