Answers are grounded in this paper and cite their sources.
Summary An oilfield operator has a requirement and therefore faces a challenge of separate production monitoring and accounting of production fluids for each reservoir, in the field case of dual completion and commingled production from different reservoirs. The existing assessment and tool-assisted methods offer only a partial solution to this problem. This article discusses the use of quantum PLT technology in directional wells by installing downhole a bottom-hole dual completion assembly equipped with quantum marker inserts for separate monitoring of production from different reservoirs. To enable separate production accounting with the use of the dynamic quantum PLT method, a straddle packer system with quantum marker inserts carrying unique inflow indicators for each production interval is installed in the cased wellbore. When contacting hydrocarbons and water, markers are released from the composite material into the fluid. In the course of the steady-state well production, wellhead fluid samples are taken sequentially. The completion assembly provides for separate accounting for each production formation without the need for well shutdown and withdrawal of pumping equipment. The samples are analysed in the laboratory using the flow cytometry method to quantify the production distribution across the well zones.
No takes yet. Share an insight, caveat, or question.
Titovsky et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: