Piping is an essential component of processing plants that transfers process fluids from one piece of equipment to another. To detect the unpredictable deterioration of piping systems, periodic or continuous pipe inspection for wall loss is conducted, which determines when preventative or corrective maintenance activities, usually replacements, should be done. Therefore, it is necessary to develop an optimal maintenance strategy to replace piping systems to reduce the overall maintenance expenditure and avert the effects of pipe failure. Most of the literature in this field concentrates on maintenance activities executed during decision-making. This paper investigates creating a system and tool to assist decision-makers in evaluating and selecting the optimal moment to replace a deteriorating pipe based on the current state of the piping system. Considering that preventative replacement of the pipeline is done during a scheduled shutdown, also referred to as a turnaround, this paper investigates making a preventative replacement ruling two turnaround cycles ahead. We account for the varying thickness at different monitoring locations of two piping systems in a refinery by applying a nonstationary gamma process with random effects. We employ the Markov decision process (MDP) and the value iteration algorithm to determine the most effective maintenance replacement policy. The outcome of our analysis is an optimal maintenance policy that minimizes the cost of maintenance.
No takes yet. Share an insight, caveat, or question.
Bediako et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: