Abstract The 6U CubeSat EIVE was developed for the verification of an E-band link from space to ground. Establishing sucha link presents challenging requirements for the development of an attitude control system of a CubeSat. To verify thefunctionality of its components, both the sensors and actuators, a number of tests were conducted prior to launch. Theseranged from simple functionality tests to performance tests and were accompanied by calibration campaigns. Qualificationof the attitude control algorithms proved to be a challenge, as a fitting simulator setup was not available. Therefore, limitedtests comparing the onboard software code to MatLab algorithms were used. This paper presents the types of testsconducted during the qualification campaign and their significance. On ground behavior is compared to in-orbit telemetry.The issues detected during ground tests as well as the issues achieving significant results from the tests are discussed andcompared to the problems detected during launch and early orbit phase. These comparisons illustrate the shortcomings ofsome of the tests executed and improvements for the validity of some tests are presented.
No takes yet. Share an insight, caveat, or question.
Eggert et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: