This article first introduces the State Grid Transmission Planning Simulation Platform based on the C/S architecture, which can achieve a working mode of remote data maintenance and networked data collaboration and sharing. Secondly, a modeling method for power grid equipment and operation case based on multi-branch planning scheme was proposed, and a method for extracting effective power grid equipment to form operation case calculation data was developed through the three dimensions of time-space-scheme; Finally, a rolling calculation process for power grid planning work was designed based on the State Grid Transmission Planning Simulation Platform. Data shows that in recent years, the application of the State Grid Transmission Planning Simulation Platform can significantly improve the effectiveness and efficiency of data preparation, thus meet the needs of the power grid planning process and research.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: