Answers are grounded in this paper and cite their sources.
A critical part of the bioenergy production process is the robust design of the supply chain network. This research proposes robust optimization programming models to design a supply chain network that generates electricity from renewable energy sources under demand uncertainty. The objective is to design a biomass supply chain network that maximizes the profit of a power plant. Given the uncertain electricity demand, a two-stage stochastic programming model is proposed. A hybrid of risk-neutral and risk-averse modeling frameworks is proposed to analyze the alternative biomass-to-bioenergy supply chain design scenarios. The mathematical model has been proven to be effective in justifying the supply chain design based on a case study of the biomass-to-bioenergy supply chain in Iran. The research findings show that the proposed stochastic programming approach outperforms the conventional optimization approaches in terms of solution robustness.
No takes yet. Share an insight, caveat, or question.
Mohagheghi et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: