A variant of technical operation of the data center's information cable system is considered, based on a gradual increase in its resources in the process of reaching the facility's design capacity ("on demand"). The prospects of applying this strategy are shown both in terms of the overall saving of financial resources and the possibility of allocating capital investments over time. Separately, it is indicated the need to apply appropriate design solutions in terms of cable routes as a necessary condition for the implementation of the strategy.