Answers are grounded in this paper and cite their sources.
_ This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 215512, “Slickline-Deployed Fiber-Optic Cable Provides First-Ever Production Profile for High-Temperature Gas Well,“ by Stuart Berry, SPE, Expro, and Danu Dirya, SPE, and Graeme Cowie, SPE, TotalEnergies, et al. The paper has not been peer reviewed. _ Distributed fiber-optic sensing (DFOS) allowed the continuous gathering of flow-profile information from a high-temperature, high-rate gas well. The objective of the case study described in the complete paper is to demonstrate that thermal inversion modeling can be used to produce a production-flow profile in an environment where conventional production logging is not possible. As a result of deploying DFOS, data can be acquired at more-realistic rates. Through performing of thermal inversion of distributed temperature sensing (DTS) data and analysis of distributed acoustic sensing (DAS) data, a more-accurate flow profile was achieved. Introduction Culzean is a high-pressure/high-temperature gas condensate field in the central North Sea. The main productive interval for the field is the Triassic Joanne sandstone deposited in a semiarid continental fluvial environment. The Jurassic Pentland sandstone deposited by meandering fluvial systems also contains significant resources. Initial reservoir pressure was 936 bar; the temperature was 170°C. The development consists of six production wells, five from the Joanne and one from the Pentland. While the reservoir interval is relatively thick, the depositional environment created a very layered reservoir with significant variability in reservoir quality. Flow-profile data over the reservoir has traditionally been acquired using production-logging tools with spinner velocity and pressure and temperature measurements. Production-log deployment can be problematic in high-rate wells, particularly when tubing is restricted because of pipe deformation or deposits in the tubing. In the Culzean field, several wells were selected for flow-profile monitoring. Previous slickline operations indicated that conventional production logging would be ineffective. Modeling showed significant tool-lift risk, meaning that the well could only be flowed at approximately 25% of its normal operating rate. A previous attempted production-logging campaign in the well resulted in no valid data acquisition but incurred a direct cost of $700,000 and a deferral of 10 days production estimated at a cost of $10.8 million. An alternative acquisition method was investigated to obtain production-profile data while minimizing risks associated with conventional production-log deployment. DFOS provides a continuous measurement over the entire length of the well for temperature and acoustic noise. A high-temperature slickline DFOS wire could allow Culzean well data acquisition under flowing conditions. Technology Selection Data acquisition was divided into a shut-in phase and a flowing phase. For the shut-in phase, a simplified production-logging toolstring was used to measure any crossflow over the reservoir section. The flowing phase would consist only of DAS data over the reservoir section, with a simple pressure/temperature memory tool in the sump of the well. The DFOS data would gather shut-in data before opening the well up to flow. For the conventional tool shut-in string, an inline caged spinner was selected.
No takes yet. Share an insight, caveat, or question.
Chris Carpenter (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: