According to the needs of production process and operation management of fast reactor power plant, a monitoring system for air temperature and waste between various important devices in the workshop was developed. This topic takes Siemens S7-300 PLC as the core. Touch screen serves as the display interface to monitor the entire production process in real time and in real time. The method of decentralized control, centralized management and modular control is adopted, so that it has high automation and reliability. The reactor can obtain a suitable temperature and humidity environment, a temperature and humidity sensor is installed at the fan inlet. At the same time, a temperature sensor is installed at the outlet of the fan to control the blowing condition by cooling dehumidification and equal humidity heating. Through the reasonable arrangement of ventilation layout and air flow, the temperature and humidity of the medium and low-pressure chamber can be best controlled by the equipment of the fast reactor.
No takes yet. Share an insight, caveat, or question.
Jian Wang (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: