Answers are grounded in this paper and cite their sources.
Installation analysis for subsea structures is performed to determine the allowable sea state for the entire operation. Usually, splash zone crossing analysis is given the highest importance, as this phase typically governs the largest forces on the system and overall sea state limitation. However, in certain conditions, subsea structures with high added mass may encounter resonance in deep water. Loads in the hoisting system can increase significantly when the system encounters resonance. The DNV recommended practice Modelling and analysis of marine operations (DNVGL-RP-N103, 2017) provide sufficient guidance on the effect of resonance; however, the resonance effect for deep-water installation operations is often overlooked and not checked thoroughly. This paper presents the importance and methodology for properly analyzing resonance effects. This paper also discusses a few techniques for improving the installation sea-state for various stages of operation and methodology for real-time vessel motion monitoring for decision-making offshore.
No takes yet. Share an insight, caveat, or question.
Sinha et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: