Answers are grounded in this paper and cite their sources.
Wells and wellheads are essential equipment for upstream business to produce hydrocarbon product (crude oil, condensate and gas) especially wellheads where all the key isolation valves and instrumentation in place to allow the business to produce safely. These important isolation valves consist of Surface controlled Subsurface Safety Valve (SCSSV), Surface Safety Valve (SSV) and Flowing Wing Valve (FWV) which may centrally control by Wellhead Control Hydraulic Panel (WHCP) via hydraulic systems. Routine test is conducted to ensure valves able to isolate hydrocarbon source during major accident hazards occurred as per API 14C or ISO10418 requirements. In Upstream Malaysia, we have encountered several challenges to meet closure time on these important isolation valves and must demonstrate ALARP to allow continue production with several mitigation in place while working on solution to resolve. Issues possess a threat over a period while structured root cause analysis (RCA) conducted. Existing aging WHCP was carried out and systematically resolved immediate issue within a year using end to end concept prescribed as Integrated Value Delivery (IVD) – a methodology cover understanding root cause of failure, improving design, organisational culture, work process and key performance indicator equipment performance monitoring for continuous improvement. In this scenario, the whole WHCP system was review from equipment ownership, related maintenance task, technical monitoring plan to prevent recurrence of major setback experience earlier. In the same time, feedback through reliability alert or lesson learnt sharing between asset and project team continues to enable a good and effective design WHCP. These improvements and lesson learnt have allowed Upstream Malaysia move from conventional WHCP that need internal combustion electric generator to a low power WHCP via renewable energy Solar or Wind. Now with a clear structured process to manage critical equipment and right collaboration culture with end to end (E2E) in mind, WHCP was improved and able to sustain the critical function allowing Upstream Malaysia to produce the needed energy safely.
No takes yet. Share an insight, caveat, or question.
Fuan et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: