Key points are not available for this paper at this time.
In this paper, we investigate a single machine scheduling problem with a proportional job deterioration. Under release times (dates) of jobs, the objective is to minimize the total weighted completion time. For the general condition, some dominance properties, a lower bound and an upper bound are given, then a branch-and-bound algorithm is proposed. In addition, some meta-heuristic algorithms (including the tabu search (TS), simulated annealing (SA) and heuristic (NEH) algorithms) are proposed. Finally, experimental results are provided to compare the branch-and-bound algorithm and another three algorithms, which indicate that the branch-and-bound algorithm can solve instances of 40 jobs within a reasonable time and that the NEH and SA are more accurate than the TS.
Building similarity graph...
Analyzing shared references across papers
Loading...
Mathematics
Shenyang Aerospace University
Add This Paper to Your Research Feed
Any time a new paper drops it will be there.
Lv et al. (Mon,) studied this question.