We consider the single-machine time-dependent scheduling problem with linearly deteriorating jobs arriving over time. Each job i is associated with a release time ri and a processing time pi(si)=αi+βisi, where αi,βi>0 are parameters and si is the job's start time. In this setting, the approximability of both single-machine minimum makespan and total completion time problems remains open. We develop new bounds and approximation results for the special case of the problems with uniform deterioration, i.e. βi=β, for each i. The main contribution is a O(1+1/β)-approximation algorithm for the makespan problem and a O(1+1/β2) approximation algorithm for the total completion time problem. Further, we propose greedy constant-factor approximation algorithms for instances with β=O(1/n) and β=Ω(n), where n is the number of jobs. Our analysis is based on an approach for comparing computed and optimal schedules via bounding pseudomatchings.
No takes yet. Share an insight, caveat, or question.
Gkikas et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: