This is the authors' abstract. We don't add key points for this paper.
Yuralpa field is characterized by a biodegraded heavy crude oil (from 14 to 18 °API) and a strong water drive that causes early water breakthrough in wells. Once the water breakthrough, the water cut increases rapidly to reach values between 90 and 95%. This effect occurs irregularly in the field and more prematurely in the wells located in the Chonta sector where the crude oil is the heaviest and most viscous. The excessive water production generates high handling costs and has caused the early abandonment of zones by applying cement squeeze and mechanical isolation (plugs) which generally required a rig intervention. This paper summarizes a case study of the first application of water control in Yuralpa field using a Hydro Selective System (HSS) completion. It describes the relevant reservoir characteristics that lead to select this type of completion for Well YCCA-020 in a field where traditionally wells have been completed in a simple way. In addition, it explains the completion design, and it details the steps to change the position of the HSS valve and production results. Well YCCA-020 was selected for this type of completion mainly because of the presence of a local vertical lithological barrier that separates the reservoir in two intervals. It is important to consider that the well was drilled in the higher viscosities sector of crude oil in the field that have more probability to leave bypassed reserves due to the difference in water-oil mobility ratio. The HSS valve was located between both intervals, and the well started producing from both intervals. Once the water cut reached 92% (105,000 bbl cumulative crude oil in 295 days), the valve was changed of position to produce from the upper interval, reducing the water cut up to 75% and increasing the oil rate to almost 200 BOPD. This completion allowed to drain the reserves of the lower interval (where the bottom aquifer is acting directly), reducing bypassed pay and to continue draining the reserves of the upper interval through a rigless intervention. The water control completion probed in Well YCCA-20 was successful. This system could lead to future applications to water control in analogous reservoirs, simultaneously decreasing the risk of bypassed reserves in the field and reducing cost compared with workover or selective conventional completion used to isolate zones.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Hernández et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: