Answers are grounded in this paper and cite their sources.
This paper presents a case study of the challenges encountered during the design and construction of a GIC foundation at a PDO Gathering Station and the innovative solutions developed to address these challenges, ensuring the project's success. The compressor foundation block was modelled and analysed using STAAD PRO FEM software. SOLID Finite element elements discretized the FEM model for accurate stress analysis. A preliminary analysis determined the necessary footprint for the compressor and its associated ancillary elements, defining the shade structure's extent and orientation. Initial dynamic parameters for foundation analysis were obtained from available literature and a decade-old soil investigation report from a nearby location. The engineering team collaborated with a consultant to correlate static-to-dynamic soil parameters for initial sizing, with the caveat that a detailed geotechnical investigation would be conducted within the new compressor's footprint. The borehole investigation revealed lower than expected dynamic parameter values, necessitating modifications to the foundation design. To avoid resonance between the foundation structure and the soil below, a thicker backfill soil layer was placed below the compressor foundation. Time constraints led to a single pour for the entire compressor foundation, requiring a detailed constructability review involving various stakeholders. The engineering and construction teams successfully completed the GIC compressor foundation casting through unprecedented collaboration, safely and within the required timeframe. By adjusting the foundation's mass and geometry and providing a soil raft below, dynamic stability was maintained, and resonance avoided. The single concrete pour, equivalent to 306 m3 or 38concrete transit mixers, was a significant accomplishment, completed in 22 hours, avoiding additional efforts required for a two-stage pour. Throughout the project, the teams demonstrated the importance of creative problem-solving, collaboration, and effective project management in complex foundation projects within the oil and gas industry. The innovative solutions developed in this project have significant implications for similar foundation projects in the oil and gas industry. The use of soil stabilization techniques, advanced foundation design, customized equipment for site access, and collaboration among stakeholders can help overcome geotechnical constraints and expedite project delivery. The project highlights the benefits of using creative problem-solving, collaboration, and effective project management in complex foundation projects. Additionally, the successful execution of a single concrete pour for the entire foundation serves as a valuable learning experience for future projects, demonstrating the potential for efficient construction methods and time-saving measures without compromising safety or quality.
No takes yet. Share an insight, caveat, or question.
Balushi et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: