Impact of material supply chain on the productivity optimization for the construction of roads projects

View Full Paper
SAShrouk AwaadFuture University in EgyptDMDina M. MansourFuture University in EgyptIMIbrahim MahdiFuture University in Egypt

Key Points

Key points are not available for this paper at this time.

Abstract

Abstract Materials require special consideration when developing a project plan because they make up such a sizable chunk of the overall budget. Materials supply and delivery are crucial especially in road construction projects as they are required for the daily construction process. Lack of materials is a major source of jobsite productivity loss. This is due to the lack of structured communication and clearly defined tasks in the current materials management methods. The divergence between design and construction, the failure to coordinate and integrate multiple functional specializations, and poor communication lead to excessive fragmentation. All of these contribute to performance issues like late material ordering and delivery, low productivity, and budget overruns. This research develops a material supply chain (MSC) framework for best practices in road construction projects at all phases. This ensures that contractors receive the supplies they need at the optimum time, with the required quantities, and at the lowest possible cost. Contractors can enhance output, save money, and stay competitive. A questionnaire was designed to investigate current practices in MSC, identify the most common obstacles that faced contractors throughout the project phases, and identify the most important contributors to the integration of supply chain in construction. The developed framework was then evaluated by road construction experts; 90% stated that the proposed framework promotes project participants to share information and data. 80% assured that the framework promotes completing the project with desired quality and encourages problem solving before it even occurs.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Awaad et al. (2024) studied this question.

synapsesocial.com/papers/68e7b3e7b6db64358770e017https://doi.org/10.1038/s41598-024-53660-6
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Supply Chain Management Framework for Construction Projects2026
  2. 2Material Planning and Management in Construction Projects2026
  3. 3Improving Road Construction Project Delivery through Material Supply Chain Efficiency: A Case Study in Nueva Ecija2026
  4. 4Issues with supply chain management documents that contribute to project delays2024 · 1 citations
  5. 5A systematic approach to identify and manage supply chain risks in construction projects2024 · 19 citations