Answers are grounded in this paper and cite their sources.
Case history demonstrates improved well integrity and CO2 resistance in gas wells, indicating effective cement technology.
Three offshore development gas wells were drilled in East Malaysia. The reservoir zones were identified to potentially contain high levels of carbon dioxide (CO₂), as well as given the potential to be utilize as CCS wells. CO2 is corrosive and may cause degradation of the cement sheath, compromising well integrity. This paper presents the decision process for selecting a suitable cement system, as well as the execution, evaluation, and improvement results applied to the three wells. The operator was committed to ensuring safer operations over the lifespan of the well by maintaining long-term well integrity. Degradation of conventional Portland cement due to the corrosive effects of CO₂ can result in compromised cement sheaths, leading to reduced gas production rates and serious environmental hazards. Implementing the appropriate technology requires well-structured planning. To achieve consistent blending of the innovative self-healing CO₂-resistant cement, a series of quality control procedures were established, supported by thorough laboratory testing and comprehensive management of the blend lifecycle. Due to its superior mechanical properties and self-healing capabilities, the operator opted to use a novel self-healing CO₂-resistant (SHCR) cement system for the gas field development. Blend homogeneity was maintained throughout the transfer process from the bulk plant to the sea vessel and then to the offshore rig, with minimal changes in specific gravity and blend composition between samples from the bulk plant and those collected at the rig. Several key logistical challenges were addressed to ensure successful delivery, including the complexities of offshore operations, job frequency, and handling requirements, as well as the setting of custom equipment specific to this rig. These challenges were effectively managed through quality control and improvement processes developed during the campaign. This paper shares lessons learned from the execution and evaluation methods deployed. Ultimately, cementing operations were successfully completed without incidents using conventional equipment. Moderate to good cement bonding was achieved across the target zones, enabling the rig to proceed with perforation, well testing, and production operations. Because of its superior mechanical properties and self-repair capabilities when exposed to CO₂-containing fluids, this innovative system is highly effective in maintaining zonal isolation and ensuring long-term well integrity. Additionally, this technology is applicable in any field globally where CO₂ regulation is enforced and safety risks exist for the operators or the public. It also enables operators to adopt proven processes for successful operations, leveraging insights gained from meticulous planning, implementation, and lessons learned.
No takes yet. Share an insight, caveat, or question.
Johri et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: