Experiment assesses part load performance of supercritical CO2 cycles in thermal energy storage, suggesting operational improvements.
Leveraging on such thermally integrated pumped thermal storage (TI-PTES) concept, the EU SCO2OP-TES project aims at demonstrating a sCO2-based TI-PTES up to TRL 5 through a lab-scale demonstration plant using industrial waste heat as integrated heat source; the charging and discharging cycles are sCO2-based Brayton heat pump and power cycles respectively, adopting radial turbomachinery for both the hot compressor(charging) and the hot turbine(discharging). Along with the mean line design and CFD analysis of the sCO2 turbomachines, this study explores the influence of their part load operation on the SCO2OPTES TI-PTES demonstration plant. The study elaborates on the effect of partial electric loads considered for hot compressor (high-temperature turbomachine for the charging) and for hot turbine (high-temperature turbomachine for discharging) on the waste heat recovery unit in the charging cycle, thermal energy storage heat exchanger, recuperator and cooler in the discharging cycle. Separate and combined performance of the charging and the discharging cycles as a result of variations in thermodynamics and mass flows is evaluated. The part load scenario shows an exceedingly small off design envelop for the charging cycle (mostly limited by the hot compressor operating envelope), while for the discharging cycle, the part load operation benefits from a broader operational range as well as allowable mitigation space. Based on such results preliminary operational constraints for the proper controllability of the cycles are suggested.
No takes yet. Share an insight, caveat, or question.
Shamsi et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: