Analysis shows reduced backreaming time in unconventional wells using innovative mud systems and techniques, highlighting significant efficiency gains.
Unconventional (UC) wells, given their narrow economic margins and short production lifespans, require strict cost control at every stage of the operation. Drilling, as one of the most significant contributors to well cost, becomes a key target for efficiency improvements. This paper addresses the recurring challenge of excessive back reaming time in the 12.25in hole section of UC wells in Southwest UAE—a problem that has, in some cases, resulted in stuck pipe incidents. The aim was to develop a consistent, field-proven approach to significantly reduce back reaming time and eliminate related operational risks. The strategy combined planned field trials with data-driven evaluations. Leveraging the advantages of pad drilling, multiple wells were drilled under comparable geological conditions, with similar well profiles enabling a systematic variation of bottom hole assembly (BHA) configurations and mud systems. Trials included different combinations of roller, concentric and eccentric reamers, as well as mud types ranging from basic brines to engineered water-based fluids. Available offset well data, including mud logs and drilling parameters records, were reviewed to guide the mud properties and density definition. Back reaming historically required up to 36 hours per well in this section — accounting for as much as 10% of total drilling time — making it a significant barrier to achieve the 15-day target for drilling 17,000 ft MD UC wells. Through iterative testing, a configuration using two roller reamers, paired with the mud system, reduced back reaming time to as little as 15 minutes. This approach not only eliminated stuck pipe incidents but also delivered substantial time and cost savings, improving the overall efficiency and economic viability of the project. This case study represents a first-of-its-kind result in the UAE's unconventional operations, demonstrating that real-time field adaptation—through smart tool selection and mud optimization—can deliver step-change performance. The methodology is practical, repeatable, and applicable to other UC developments facing similar challenges.
No takes yet. Share an insight, caveat, or question.
Albellihy et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: