Assessment shows effective sand management enhances productivity and operational efficiency in gas wells, suggesting unique perforation methods may reduce sand entry risks.
Sand production is recognized as a productivity reducing factor during production phase, especially for marginal reservoirs. Intrusion of sand production at surface requires effort to choke back production below Maximum Sand Free Rate (MSFR) and resulting in sub-optimal production. Uncontrolled sand production at surface could lead to equipment erosion, flow restrictions, and increased of operational risks such as Loss of Primary Containment (LOPC). Effective remedial sand management is crucial for maintaining downhole and surface well performance and its operational efficiency to maximize the gas reserve. Working in slim hole cemented monobore gas well is truly challenge in many reasons thus requires a unique approach on the conveyance and practical remedial sand control solution to minimize sand production and prolong well life to maximize reserve. A bottom-up completion strategy is adopted as the Reservoir Management Plan (RMP) where many of the remaining reserve and re-completion opportunities are at the shallower sand intervals (TVD 1500m and less), which known as sand prone producing reservoir. These situations will require practical and cost-effective remedial sand management plan for all wells including highly deviated wells. Thorough feasibility study between active technique (mechanical & chemical) and passive remedial options was evaluated to determine the best sand remedial approach to produce well at its optimum gas production rate and delaying the sand entry into the wellbore. Options for chemical and mechanical remedial may seem efficient but introduce more complexity and higher operating cost based on the feasibility study conducted. Implementation of oriented perforation based on geomechanics study recommendation is the practical method as it increases the drawdown operating envelope to produce gas without sand issue as the well is to be perforated parallel (oriented) to the maximum overburden stress. The selected passive oriented perforation method that carried out in the field demonstrated the best and practical remedial sand control solution in cemented monobore gas well by minimizing and delay sand production while enhancing well productivity and reducing intervention cost. The findings contribute to improved sand management practices, ensuring sustained well performance and operational efficiency in the challenging reservoir environments. This paper will explain on the company journey on evaluating the practical remedial sand control method in Sarawak (SK) gas well, details process involves during the evaluation, share the summary of operational outcomes and optimization been carried out and sample of wells performance post-oriented perforation completion.
No takes yet. Share an insight, caveat, or question.
Ghazali et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: