Analysis reveals 13% cost difference in prefabricated concrete construction in Guangzhou, suggesting better cost control methods.
As prefabricated buildings become more prevalent, a clear understanding of their cost differences relative to conventional construction is increasingly critical. This paper explores the cost differences between using prefabricated concrete and in situ concrete in residential buildings in Guangzhou, China. Cost data from four case studies were analyzed to identify the categories and magnitude of cost variations. Two pairs of structurally identical buildings—one using conventional methods and the other adopting prefabricated components—were selected for comparison. By analyzing the cost differences from similar buildings, this paper can unveil two key findings: (1) construction cost categories affected by the change of concrete works in construction methods (from conventional to prefabricated) and (2) percentages of the cost difference. Based on China’s GB50500‐2013 cost classification, only three categories are affected by this change, namely work sections and trade costs, preliminary costs, and value‐added tax (VAT). Furthermore, only five out of 13 items in works sections and trade costs and seven out of 11 items in preliminary costs are affected by this change. It was also discovered that the percentage difference of total cost is about 13%, with work sections and trades costs difference margin is just under 0.2% (9.95%–10.06%). Interestingly, both preliminary cost and VAT spotted similar cost difference percentages for both pairs, that is 2.2% and 1.1%, respectively. These findings offer valuable insights for improving cost control in prefabricated construction.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: