High-resolution simulations reveal structural loading challenges for wind turbines during tropical cyclones, suggesting site-specific considerations for offshore wind energy.
Wind turbines deployed in offshore wind energy lease areas along the US East Coast could significantly contribute to the national electricity supply. This region is also impacted by powerful tropical and extratropical cyclones that may lead to high structural loading on wind turbines and support structures and, in the event of above cut-out wind speed, low power production (capacity factors < 0.2). Four sets of high-resolution simulations are performed for two category 3 tropical cyclones that tracked close to current offshore wind energy lease areas to assess the possible impacts on, and from, wind turbines. Simulations of Hurricanes Irene and Sandy are performed at convective-permitting resolution (grid spacing in inner domain of 1.33 km) with both the Weather Research and Forecasting model (WRF, v4.2.2) and the Coupled Ocean–Atmosphere–Wave–Sediment Transport (COAWST, v3.7) model to characterize geophysical conditions of relevance to offshore wind turbines. These simulations are performed without and with a wind farm parameterization (WFP) active, with the latter using the assumption that existing lease areas are fully populated with 15 MW wind turbines at a 1.85 km spacing. Many aspects (e.g., track, near-surface wind speed, sea level pressure, precipitation volumes) are well reproduced in control simulations (no WFP) with both WRF and COAWST, particularly for Hurricane Sandy. COAWST simulations lead to more intense cyclones with a slightly larger area of storm-force wind speeds, a higher likelihood of hub-height wind speeds > 25 m s−1, and higher precipitation volumes, possibly indicating underestimation of hurricane risk in uncoupled simulations. All eight simulations indicate maximum hub-height wind speeds within the existing lease areas below 50 m s−1. However, COAWST simulations indicate frequent wind–wave misalignment of > 30°, and the joint occurrence of significant wave height, hub-height wind speed, and wave period in some lease areas reaches levels that are likely to be associated with large structural loads. This work re-emphasizes the utility of coupled simulations in describing geophysical conditions of relevance to offshore wind turbine operating conditions.
No takes yet. Share an insight, caveat, or question.
Thompson et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: