The proposed framework improves geometry integration in underground utilities, suggesting significant digital transformation in construction practices.
Underground utility projects still rely on 2D drawings, which fragments geometry, process, and cost information and raises the barrier to BIM adoption. There is a need for a practical method that preserves existing CAD workflows while achieving integrated, higher-dimensional management. This study proposes a unified framework that converts 2D CAD into 3D BIM and automatically combines work and cost information to produce 5D outputs in a single, interoperable model. The approach aims to maintain data continuity from design to construction, reduce manual modeling effort, and lower adoption costs. A prototype system and viewer were developed to validate the end-to-end flow and to confirm that geometry, schedule, and cost can be reviewed together. The framework offers a feasible path for digital transformation in underground utilities and can be extended toward 6D and 7D for performance and operations management.
No takes yet. Share an insight, caveat, or question.
Lee et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: