Framework demonstrates optimized installations of energy storage and generation in distribution systems, suggesting reduced costs.
A multistage coordinated expansion-planning framework for distribution systems is developed to jointly optimize investments in the network, distributed generation (DG), and energy storage systems (ESS). Network reinforcements select from multiple feeder and transformer candidates, while DG installations consider conventional and photovoltaic (PV) options. In this study, a set of candidate buses are considered for the installation of PVs and energy storage systems. Therefore, the expansion plan can determine the optimal installation locations and timing of these candidate assets. The objective minimizes total cost in net-present-value terms, covering investment, maintenance, generation, and operating components. Representative hourly load profiles are incorporated to capture ESS dispatch behavior and PV output variability; operating costs are modeled via piecewise linearization. To preserve connectivity and preclude islanding in the presence of DG and ESS, modified radiality constraints are imposed. The formulation is a mixed-integer linear program solvable efficiently by commercial optimizers, and numerical studies confirm the method’s effectiveness.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: